B-1.1, r. 2 - Construction Code

Full text
10.26. The installation of a springboard or diving platform must comply with the minimum dimensions indicated in the table in Schedule III. The reference point when measuring is the plummet or vertical line passing through the centre of the end of the springboard or diving platform.
O.C. 115-2013, s. 1.